Make your move to Mainroad — Hiring Now!

Hiring Now!

Mainroad Group

Central Alberta Media

Welcome to Mainroad Group’s Media Centre – a trusted source for information – latest news releases, videos, photos, FAQs and other shareable resources. For more information, contact Mainroad Group Communications at (604) 575-7020 or communications@mainroad.ca. You can also connect with us on social media.

Frequently Asked Questions

Winter Operations FAQs

Mainroad Alberta Contracting LP

Safe Driving with Snow Plows

Tips for driving safely around snow plows

Highway Maintenance Videos

Road Safety Campaigns

Photo Bank

https://mainroad.ca/wp-content/uploads/2020/07/MAC-Winter-Operations-small.jpg

Mainroad Alberta Contracting LP Photo Bank

Mainroad Chinook Contracting

Mainroad Chinook Contracting LP Photo Bank

Recent News

Winter is Coming

Winter is Coming

Winter is Coming! No matter the location, the weather, or the time of day, EZ Street® Asphalt is a  permanent pothole repair solution. For more information visit www.ezstreetasphalt.ca  or call us toll free 1-877-575-7023. EZ Street® Asphalt is a Mainroad Maintenance...

read more

Mainroad helps improve Pemberton Rail Crossing

A number of safety concerns were  eliminated as a result of improvements to the Pemberton Rail Crossing at Birch Street.   Mainroad Howe Sound Contracting along with CN Rail, and the Ministry of Transportation and Infrastructure received kudos from Pemberton Mayor...

read more
EZ Street Asphalt utilized on Deering Bridge Resurfacing

EZ Street Asphalt utilized on Deering Bridge Resurfacing

The weather conditions were not ideal for the utilization of regular asphalt but were ideal to demonstrate the benefits of EZ Street® Asphalt for resurfacing the Deering Bridge at Port Renfrew, Vancouver Island. EZ Street® Asphalt is a high performance...

read more